SELECTION AND IMPLEMENTATION OF A POSTCLOSURE .
• Previous underground mine dewatering included pumping via a decline (6,000 ft) to the surface • The mine was closed in June of 2014, which included permanent closure of the underground workings • A new surfacebased method of maintaining water levels in the underground mine was needed Decline Pump at the bottom of the Decline